Project Management assignment jobs

Hi,

I would like to get an idea about the following area on the project:

: 1. Description 2. Distribution – Normal, Lognormal, Triangular 3. Likely cost 4. Low cost 5. High-cost

1. Generate the histogram of overall cost distribution 2. S-curve 3. Statistics 4. Sensitivity analysis 5. Cumulative probabilities.

  • May 7
  • Muvattupuzha, Kerala, India
  • $7/hour

Locations